The Wall
Forum / Strictly Steam / boiler replacment
  • Post a Reply to this Thread

    boiler replacment (3 Posts)

  • Flip Flip @ 6:47 AM
    Contact this user

    boiler replacment

    can some one tell me the proper vents to replace the ones on the dry and wet returns on a vapor system with 470 sq. ft. of radiation. the vent now on the dry return says Trane #2 quick vent the one on the wet says Trane float vent  1010-1?
  • Steamhead Steamhead @ 12:07 PM
    Contact this user

    Measure

    the length and diameter of the steam main and we can tell you what you need. 
    "Reducing our country's energy consumption, one system at a time"

    Steam, Vapor & Hot-Water Heating Specialists

    Oil & Gas Burner Service

    Baltimore, MD (USA) and consulting anywhere.
  • Flip Flip @ 3:18 PM
    Contact this user

    steam main

    steam supply 40' - 2 1/2"  , 75'-2"
    return 15'- 3/4"  ,  25'- 1"  ,  75'- 1 1/4"
    this runs the peremeter of the basement feeding rads on 1st & 2nd floor
  •  
Post a Reply to this Thread