The Wall
Forum / THE MAIN WALL / Completed boiler & chiller instal
  • Post a Reply to this Thread

    Completed boiler & chiller instal (15 Posts)

  • Henry Henry @ 10:53 AM
    Contact this user

    Completed boiler & chiller instal

    This was a complete replacement of the boilers and chillers in a 32 floor building in Old Montreal. There are 7 colours of vinyl cladding of the insulation of which 3 were special order. I took the pictures last week. One of the chillers was working as the South side of the building was getting sun. There are a 36 Armstrong pumps. It was a 1 year project.
  • knotgrumpy knotgrumpy @ 12:34 PM
    Contact this user

    Beautiful

    Nice work!  Wow!
  • gerry gill gerry gill @ 9:32 PM
    Contact this user

    wow- the bar has been set high!

    very impressive
    Serving Cleveland's eastern suburbs from Cleveland Heights down to Cuyahoga Falls.
  • Steamhead Steamhead @ 12:01 AM
    Contact this user

    What

    was there before?
    "Reducing our country's energy consumption, one system at a time"

    Steam, Vapor & Hot-Water Heating Specialists

    Oil & Gas Burner Service

    Baltimore, MD (USA) and consulting anywhere.
  • Techman Techman @ 6:05 AM
    Contact this user

    New install.

    WOW ! Very very nice! I'm drooling here.lol.  How about a breakdown of all of those colored pipes!! Whats inside of them? What type of facility?
  • Techman Techman @ 6:05 AM
    Contact this user

    New install.

    Twitchy finger.
    This post was edited by an admin on March 6, 2014 6:06 AM.
  • heatpro02920 heatpro02920 @ 7:52 AM
    Contact this user

    Very Impressive

    Nice work...
  • tim smith tim smith @ 9:29 AM
    Contact this user

    review

    I think in 2nd pic from top, I see a screw that is a 1/2 turn loose ;)
  • M Lane M Lane @ 11:03 AM
    Contact this user

    !!!!

    Very nice. It's so rare that there's money in the budget to do that nice of a job. You should be very proud.
  • nicholas bonham-carter nicholas bonham-carter @ 3:45 PM
    Contact this user

    Seven colors?

    Hot water supply
    Hot water return
    Cold water supply
    Cold water return
    Cold air
    Hot air (politicians floor)
    Sewage ditto
    Hopefully the south side chillers were pumping their heat into the north side--NBC
  • KC_Jones KC_Jones @ 6:15 PM
    Contact this user

    bedroom

    In the corner so I could live there?  That is beautiful!
    Just another homeowner trying to find his way through.
  • smklin smklin @ 9:26 AM
    Contact this user

    NICE

    and they say there is no good help left. BEAUTIFUL
  • Henry Henry @ 9:32 AM
    Contact this user

    Tower

    It is an office tower that had two fire tube Volcano boilers. I has actually 8 colours of vinyl covering. BTW, all the pumps have drives on them. The control contract alone was $2 million. There is also some free cooling using a large plate heat exchanger. There are two water towers. I have previously posted pictures of the 800 ton crane loading one tower, the chillers and pumps. We had cut a hole in the roof to remove the old and drop in the new. On a second occasion, we lifted the North side water tower and the boilers. We are presently replacing the water towers and chillers of the Olympic village two residence complexes
  • Paul Pollets Paul Pollets @ 9:49 AM
    Contact this user

    Pumps

    Nice looking work. Are the pumps on VFD?
  • Henry Henry @ 10:15 AM
    Contact this user

    Pumps

    Yes, VFD
  •  
Post a Reply to this Thread