With what you are saying Joey you just Go For It.
put purge valves on the supply and return headers so you can force purge air from each zone....Good luck.
I"ll put it as simple as poss.
hot wtr syst, 11/4 feed and return over head in basement w/11/4 x 3/4 tees,,not moniflow tee..going to 2nd floor convector rads.I't worked for the fist floor not sure if it will pull for second floor
should i use 2 pumps on the syst? 1 on the feed and 1 on the return...
nope...Would not be prudent,1000 points of light,stay d corse
:)
tees
I just came accross a system with a 1 inch main,that had a 1x3/4x3/4 tee connected by 3/4 inch pipe then the same tee, it worked great