This manual was created by O-E Specialty Manufacturing Co. and outlines how to install the "O-E" Perfect System, which is a Vapor Vacuum heating system.
Construction and Rehabilitation Costs for Buried Pipe with a Focus on Trenchless Technologies
This technology helps prevent groundwater pollution and makes pipe replacement far more affordable for residents and municipalities. Plus, it also saves many yards, sidewalks and streets from being dug up. Thanks to David Goldman for finding and sharing it with us.
Categories
Leave a comment
Comments by Vanilla
Related Posts
O-E Vapor System Manual
H.B. Smith Company Oil Fired Cast Iron Hot Water Boilers (1972)
Here is the original Installation and Operating Instructions and Parts List for The H.B. Smith Company's Oil Fired Cast Iron Hot Water Boilers (No. OHB-13W). This is esti...
Heating the Henry Ford Museum
The Henry Ford Museum in Dearborn, MI has an interesting hot-water heating system. Take a look at the radiators below. They are from the Shaw-Perkins Manufacturing Compan...